![]() ![]() The filtered water is directly returned to the tower, resulting in no water loss, nor a required shut down for cleaning. In addition to vacuum removal of debris, using Goodway's CTV Filtration System, the basin's water is micron-filtered clean down to 5 microns, returning crystal clear water with greatly reduced potentially harmful bacterias including Legionella. Step 4: Cold Water Basin Cleaning Cleaning the cold water collection basin(s) using our powerful, industrial-grade, Goodway CTV-1501 Vacuum system that removes heavy debris including sludge, mud, or any industrial waste material. Step 3: Hot Water Basin Cleaning: Cleaning the hot water distribution basin(s) by removing any heavy debris, then dry vacuuming thoroughly clean. Step 2: Heat Transfer Media Cleaning: Removing debris and lightly pressure washing and/or vacuuming inlet louvers, drift eliminators, and fill media. Step 1: Exterior Debris Removal: Pressure washing the interior and exterior of the cooling tower, removing dirt, debris, scale, mold, algae, and other contaminants. ![]() No draining of the cold water basin meaning no production downtimeĬooling Tower Cleaning Process - Step By StepĬyrco, inc.'s complete, multi-process, cooling tower cleaning service typically consists of:.A safer cooling tower for all personnel within a 2 mile radius as our EPA approved, sanitizing disinfectant application kills bacteria and viruses.Non-toxic, eco-friendly, disinfectant application that kills Legionella and further stunts bio-growth.Extended life of the cooling tower's external structure.Reduced unnecessary stress on internal parts resulting in less mechanical failures and unnecessary shut downs.Improved thermal transfer rates due to unfouled and cleaned heat transfer media: inlet louvers, drift eliminators, and fill media.A cooling tower that runs more energy efficient including water retention.Increases Energy Efficiency, Thermal Performance, and Life-Span of the Cooling Tower. Non-Toxic Disinfectant Kills Legionella and Further Stunts Bio-Growth. Removes Algae, Scale, Mud, and Other Contaminants. OSHA 10 & 30-Hour Construction Training ClassesĬooling Tower Cleaning Services: Pressure Washing, Debris Removal, Basins Cleaning, & Disinfecting | Cyrco, inc.Cleaning Services: Interior & Exterior, Non-Toxic Disinfecting.Misc: Fan Stacks, Fan Belts, Switches, Nozzles, Etc.Rebuild of Old Factory Assembled (FAP) Metal Cooling Towers.Rebuild of Old Field Erected (FEP) Cooling Towers.New Factory Assembled (FAP) Metal Cooling Towers. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |